• Auto Program Paper Cutting Machine Installation Intruction
  • Auto Program Paper Cutting Machine Installation Intruction
  • Auto Program Paper Cutting Machine Installation Intruction
  • Auto Program Paper Cutting Machine Installation Intruction
  • Auto Program Paper Cutting Machine Installation Intruction
  • Auto Program Paper Cutting Machine Installation Intruction

Auto Program Paper Cutting Machine Installation Intruction

Classification: Single-blade Cutter
Driven Type: Hydraulic
Type: Industrial Cutter
Blade Material: HSS
Computerized: Computerized
Process: Paper Machine
Customization:
Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
WT-PC1150
Model
Qz1150-10m
Usage
Paper Plastic File Cutting
Packing
Plastic Packing Inside and Wooden Packing Outside
Max Cutting Width
115cm/45.3inch
Touch Screen Size
10 Inch
Max Cutting Height
16.5cm/6.5inch
Cutting Speed
45 Cycles/Min
Lead Time
10 Days After Receiving Deposit
Warranty
12 Months
Transport Package
Wooden Cases
Trademark
WT
Origin
Dongguan City China Prc
HS Code
8441100000
Production Capacity
5000

Product Description

QZYK1150D-8M10   Auto Double Hydraulic Program Control Paper Cutting Machine
Auto Program Paper Cutting Machine Installation Intruction
Main T
echnical Data:

 
Model
Parameters
660 780 920 1150 1300 1370 1640 2000 2200
M M M M A M M A M M M
Cutting Width (mm) 660 780 920 1150 1300 1300 1370 1640 1640 2000 2200
Cutting Length (mm) 660 780 920 1150 1300 1300 1370 1600 1600 1600 1600
Cutting Height (mm) 110 110 110 160 120 120 160 120 160 170 170
Workbench  Protraction Length (mm) 510 510 610 700 700 700 700 700 700 700 700
Workbench Height (mm) 930 930 930 930 930 930 930 930 930 930 930
Motor Power (kW) 3 3 3 5.5 5.5 5.5 5.5 7.5 7.5 7.5 7.5
Maximum Paper Pressing Pressure (dan) 3000 3000 3500 3500 5000 5000 5500 5500 5500 6500 6500
Cutting Speed (times/min) 42 42 42 42 36 42 42 36 42 42 42
Net Weight (kg) 1900 2100 2300 3800 3300 3500 4500 55000 6500 9000 10000
Boundary Dimension (m) 1.5*1.8*1.5 1.6*1.9*1.5 2.3*2.3*1.5 2.5*2.7*1.6 2.7*2.6*1.6   2.8*3.2*1.7 3*3*1.6   3.7*3*1.7 3.9*3*1.7
Package Size (m) 1.8*2.1*1.7 1.9*2.2*1.7 2.4*1.4*1.7 2.6*1.7*1.9 2.8*1.4*1.9   2.8*1.7*2.0 3.1*1.7*2   3.8*1.7*2.5 3.8*1.7*2.5

Installation Dimension:
  660 780 920 1150 1300 1370 1640 2000 2200
M M M M A M M A M M M
L 1.5 1.6 2.3 2.5 2.7 2.7 2.8 3 3 3.0 3.0
W 1.8 1.9 2.3 2.7 2.6 2.9 3.2 3 3.2 3.7 3.9
H 1.5 1.5 1.5 1.6 1.6 1.6 1.7 1.6 1.7 1.7 1.7

Installation Instructions:

Installation Instruction
  1. UnLoad the Machine by 5 Tons Fork Lift
 
  1. Detach the platform from the tray
 
  1. Detach the fuselage from the tray

4,Insert the platform through the back of the fuselage



Next We need to Fix the support rod


There is a positioning pin at the bottom right of the platform. The platform is installed in the positioning pin hole in the fuselage. There are also two screws On The right bottom of the platform which are used to adjust the position of the platform.

After finishing the platform installation to the fuselage we need use the Level Ruler to check if the platform is level.  Otherwise we need to adjust the height of support rod to make sure the platform is level.

5,Install the two side shields

6, Install the Triangle Shield first But do not tight the screw first. Second we install the small platform, Also need to test level by level ruler. After Finishing small platform, We move the Triangle Shield close to small platform. Then Tight the screw of Triangle Shield.

7,Under the platform behind the fuselage, there are 2 connecting lines, 1 aviation plug, 2 air pipes, and Make they are connected.


The Installation finished.




Test Before Working
  1. Connect all the cables and air tube. Get the machine Power on the machine.
  2. Turn on the main motor and see if the flywheel is running at right direction.

If it is not running at right direction then interchange  Any two of the three fire lines.
3,Turn on the power, click the touch screen, press the enter key, the interface switches to the work interface, click the auto button, the paper feeder automatically runs the calibration.
4,Start the main motor, Use the foot pedal to make paper press test, the paper press will be pressed down to the red knife bar on the platform, then check if the paper press is on the trace line in red knife bar(left and right position is consistent )(There is a trace line in the red knife bar left by the cutter in factory which is used as a reference to test machine)


If the paper press pressed down to the red knife bar on the platform, But the paper press is not 100% on the trace line in red knife bar(left and right position is not consistent ) . Then we need to adjust it. By below methods:
  1. Under the left side of the platform, there are two adjustment screw in front and rear, one is for forward and the other is for backward. The principle is to set a straight line at two points, one point to fix, another to adjust.

After adjustments tight all the screws.

All are finished, load the paper then have a try.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now